Solar for your business

Hedge against rate hikes. Depreciate the asset. Keep the cash flow.

Roof-mount, ground-mount and carport systems engineered to your facility’s load. Most commercial projects pay back in 4–7 years and produce for 25+.

Local installer · Since 2009

Built for real operating environments.

Warehouse & industrial

Retail & Hospitality

Agriculture

Public & non-profit

Large flat-roof systems with minimal operational disruption.

Warehouse & industrial

Large flat-roof systems with minimal operational disruption.

Retail & Hospitality

Carports + rooftop combos with optional EV chargers.

Agriculture

Ground-mount systems and farm-load offset with USDA REAP.

Public & non-profit

Direct-pay options under Inflation Reduction Act §6417.

Warehouse & industrial

Retail & Hospitality

Agriculture

Public & non-profit

Large flat-roof systems with minimal operational disruption.

The CFO view

Commercial solar is mostly a tax & depreciation story.

Between the 30% Investment Tax Credit, 5-year MACRS depreciation, and bonus depreciation, most owners recover 60%+ of the system cost inside year one.

Sample system size

250 kW

Sample system size

250 kW

Sample system size

250 kW

Installed cost

$575k

Installed cost

$575k

Installed cost

$575k

30% ITC

$172k

30% ITC

$172k

30% ITC

$172k

5-yr MACRS value

$144k

5-yr MACRS value

$144k

5-yr MACRS value

$144k

Energy savings

$48k/yr

Energy savings

$48k/yr

Energy savings

$48k/yr

Payback after incentives

5.8 yr

Payback after incentives

5.8 yr

Payback after incentives

5.8 yr

How a commercial project runs

Engineered, financed and installed in-house.

step 01

Site audit

Roof structure, load profile, interconnection.

step 01

Site audit

Roof structure, load profile, interconnection.

step 02

Proposal

Pricing, financing options and IRR model.

step 02

Proposal

Pricing, financing options and IRR model.

step 03

Engineering & install

Stamped drawings, permits, electrical work, and phased installation.

step 03

Engineering & install

Stamped drawings, permits, electrical work, and phased installation.

step 04

O&M

25-year monitoring, cleaning, warranty support, and system performance care.

step 04

O&M

25-year monitoring, cleaning, warranty support, and system performance care.

Smoothest commercial project we've run in five years. Zero downtime, all permits handled.

Rita G.

Facilities Manager · Riverside Warehouse (250 kW)

Smoothest commercial project we've run in five years. Zero downtime, all permits handled.

Rita G.

Facilities Manager · Riverside Warehouse (250 kW)

Smoothest commercial project we've run in five years. Zero downtime, all permits handled.

Rita G.

Facilities Manager · Riverside Warehouse (250 kW)

Commercial FAQ

Sharp questions deserve sharp answers.

Commercial FAQ

Sharp questions deserve sharp answers.

01

Will install disrupt operations?

We sequence work around your hours. Roof crews never block loading docks or main entries.

Cash, loan, lease or PPA?

What about RECs and carbon credits?

Do we need to upgrade our service?

Ready when you are

Request a commercial proposal.

Share 12 months of bills and we'll deliver a sized system, financing options and 20-yr IRR within a week.

Ready when you are

Request a commercial proposal.

Share 12 months of bills and we'll deliver a sized system, financing options and 20-yr IRR within a week.

Ready when you are

Request a commercial proposal.

Share 12 months of bills and we'll deliver a sized system, financing options and 20-yr IRR within a week.

Create a free website with Framer, the website builder loved by startups, designers and agencies.